MASSIVE EARTHWORKS
Since Dams, Barrages and
highways are a major part of our operations, therefore formation of
flood protection embankments, river training works, diversion
channels and bulk earthfill / rockfill of any type and magnitude
come in the natural domain of SKB. The firm has a fleet of
specialized machinery for catering to the needs of mass earthmoving
operations.
SKB has the capacity of 18000 Tons / Day of massive earthworks &
transportation to any job site through its remarkable large fleet of
heavy machineries.
SKB notable projects in this sector are as under:
|
Earthworks
for development of Balloki Barrage & Canal
Distributaries System of LBDC, Punjab Pakistan |
2012-2014 |
|
Bulk
Earthwork for Canyon Views Islamabad |
2008 |
|
Earthworks
for Sabakzai Dam & Irrigation System, Baluchistan
Pakistan |
2007 |
|
Earthworks
for Ghazi Barotha Barrage and Power Channel, Pakistan
|
1996-2003 |
|
Stone
Rip-rap on Protection Bund, Kundlani Bridge |
|
|
Earthworks
of Nara Canal, Sukkur Pakistan |
1996 |
|
Chakora
Nullah Flood Protection Project, Karachi Pakistan |
1992-94 |
|
River
Training works for Kech River, Turbat Baluchistan
Pakistan |
1987-90 |
|
Roads &
River Training works Karachi Development Authority
Pakistan |
1987-89 |
|
Earthworks
for Hub Dam Spillway, Baluchistan Pakistan |
1978-79 |
|
Earthwork in
Rainee Canal Project Pakistan |
|
|
River
Training works for Hub River Bridge, Baluchistan
Pakistan |
1971-72 |
Snapshots of some
prestigious projects completed by SKB in this sector are as under:
 |
 |
 |
 |
|
Earth work at Nara Canal – Pakistan |
Earthwork at
Ghazi Barotha Power Channel – Pakistan |
|
|
 |
|
 |
 |
 |
 |
|
Flood protection works on Chakora Nullah at
Karachi – Pakistan |
Stone Rip Rap on protection Bund Kundlani
Bridge – Pakistan |
River Training Works for Hub River
Baluchistan – Pakistan |
|
|
 |
|
 |
|
|
River Training Works for Kech Kaur River
Turbat – Pakistan |
|
|
|
|
|